Case study
ASHRAE Level 1–2 style audit with prioritized measures
Small commercial audit that produced a practical, staged list of operational and retrofit measures.
Context
- Project type: Small commercial (non-industrial)
- Stage: Existing building operations review
- Primary goal: Identify practical measures and “next study” items
The problem
The client wanted a structured audit to identify high-confidence operational improvements and staged retrofit opportunities.
Our approach
- ASHRAE Level 1–2 style walkthrough and analysis
- Emphasis on controls, scheduling, and high-confidence measures
- Clear separation between quick wins and deeper-study items
What we delivered
- Prioritized measures list
- Notes on implementation and sequencing
- Clear assumptions and boundaries
Outcome
The client received a practical roadmap that supported near-term action and informed future planning.
Next steps
Implement operational measures first, then evaluate deeper retrofit items as warranted.